New construction HVAC in Nashville, TN

The plans are drawn and framing is close, but the heating and cooling still needs a size, a duct layout and a place for the equipment. We answer around the clock, so builders and owners can reach us between site visits.

  • Answering 24/7
  • Custom homes and additions
  • Sized from your plans

Updated October 2026

New ductwork run through open framing before drywall
Quick answer

New construction HVAC in Nashville starts with the plans: a Manual J load calculation sets the equipment size and a Manual D layout sizes every duct before framing closes in. Inside Davidson County, mechanical work runs under a Metro Codes trade permit, so rough-in and inspection have to fit the build schedule. Call (615) 412-2815 at any hour.

Overview

Getting heating and cooling right while the walls are open

A new house is the one chance to put the ducts exactly where they belong. We work from the floor plans, window schedule and insulation specs to size the system, then lay out supply and return runs so every room gets its share of air. Equipment location gets settled early, since a closet framed for a furnace won't hold a variable-speed air handler and its return.

Rough-in happens after framing and before insulation and drywall. Trim-out and startup come after the finishes, when we set the outdoor unit, connect the line set and commission the system.

New heat pump set beside a newly built house
Built from plans

Custom homes

Custom homes often have tall ceilings, big glass and bonus rooms over garages, and each of those can leave one room hot while the rest of the house is fine. We run the load room by room so each duct matches its room, not just the total tonnage.

Two-story houses usually do better with two systems, or one system with zoning, since heat collects upstairs all summer. We plan a return air path for every closed bedroom, space for a media filter, and a condensate route that drains by gravity where it can. Tight new houses also get fresh-air ventilation designed in.

Adding rooms

Additions and remodels

An addition raises one question first: can the existing system carry it? Often it can't. A system sized for the original house runs longer, and the new room sits at the end of a long duct run. We calculate the added load, then measure what the current system actually delivers.

The answer may be a branch off the existing trunk, a ductless mini-split for the new space, or a larger system for the whole house. For a remodel that moves walls, we reroute supplies and returns so no bedroom loses its only return.

Cost

What sets the cost of HVAC in a new build

Without plans there is no honest number, but these are the items that move it.

  • Size and layout. Square footage, ceiling height and the number of floors set the tonnage and the length of duct runs.
  • Systems and zones. A second system or a zoning setup adds equipment, dampers, controls and duct work.
  • Equipment type. Heat pump, gas furnace or dual fuel, single-stage or variable-speed, each changes the equipment price.
  • Duct location. Ducts kept inside conditioned space take more framing coordination but lose less energy than attic runs.
  • Ventilation and air quality. Fresh-air ventilation, media filters and dehumidifiers add parts and wiring.
Around Nashville

Building in a fast-growing county: permits and timing

Davidson County added about 9,300 residents in 2025 to reach roughly 745,900, and growth on that scale means new houses, infill lots and additions. Within Davidson County, Metro Nashville Codes posts a gas/mechanical trade permit application, and trade permits are filed through an e-permit account, so the HVAC rough-in inspection has to be lined up before insulation goes in. Outside Davidson County, permits run through that county or city, and we confirm the process before the schedule is set.

Scope

What the new construction scope covers

  • Manual J load calculation from your plans
  • Manual D duct layout with supply and return sizing
  • Rough-in of ducts, line set, drain and thermostat wire
  • Equipment set, connection and refrigerant charge
  • Airflow balancing at every register
  • Startup walkthrough of the thermostat and filter location
How a visit runs

How the HVAC work moves with the build

  1. 1

    Review the plans

    We take the drawings, window specs and insulation levels and run the load calculation.

  2. 2

    Design and price

    You get equipment sizes, a duct layout and a price before framing finishes.

  3. 3

    Rough-in

    Ducts, line sets, condensate lines and thermostat wire go in while walls and ceilings are open.

  4. 4

    Trim-out and startup

    After the finishes we set the equipment, charge it and test airflow at each register.

Timing

How the HVAC schedule fits a build

Design and pricing take a few days once we have complete plans. Rough-in for a single-family house runs several days on site, depending on its size and the number of systems, and it has to finish before insulation and drywall.

Trim-out and startup come near the end, once flooring and paint are done and permanent power is on. An addition moves faster: a short rough-in, then a day to tie in and test. We'll line our dates up with your builder's schedule.

Equipment

Brands we work on

We service and install equipment from the major manufacturers, including Carrier, Trane, Lennox, Rheem, Goodman, American Standard, Daikin, Mitsubishi Electric, Bryant, Ruud, York and Amana.

Questions

New construction HVAC questions from builders and owners

Related

Other system work for a new or growing home

Building or adding on? Call before framing closes.

Send the plans our way and we will set a time to review them.